Table 1. Key IMF Financial Statistics
|
as of December 15, 2011
|
(In billions of SDRs, and end of period, unless indicated otherwise)¹
|
(For definitions, see below)
|
|
|
|
2011
|
|
|
2010
|
Q1
|
Q2
|
Q3
|
Q4 to date |
|
|
Financial Assistance
|
|
|
|
|
|
|
GRA
|
|
|
|
|
|
|
Purchases (during period)
|
20.3
|
10.3
|
7.2
|
8.4
|
2.0
|
|
Of which: financed by Fund bilateral borrowings
|
10.3
|
5.0
|
0.8
|
2.4
|
1.0
|
|
Of which: financed by NAB borrowings
|
--
|
--
|
4.2
|
2.6
|
--
|
|
Repurchases (during period)
|
1.9
|
0.4
|
0.4
|
0.7
|
0.5
|
|
Credit outstanding
|
55.6
|
65.5
|
72.3
|
80.1
|
81.6
|
|
|
|
|
|
|
|
|
PRG Trust
|
|
|
|
|
|
|
Disbursements (during period)
|
0.9
|
0.1
|
0.2
|
0.2
|
0.1
|
|
Repayments (during period)
|
1.1
|
0.1
|
0.1
|
0.1
|
0.1
|
|
Credit outstanding
|
4.8
|
4.9
|
5.0
|
5.1
|
5.1
|
|
|
|
|
|
|
|
|
HIPC (SDR millions)
|
|
|
|
|
|
|
Number of countries
|
36
|
36
|
36
|
36
|
36
|
|
Commitments (cumulative)
|
2,416
|
2,416
|
2,416
|
2,416
|
2,416
|
|
Disbursements (cumulative)
|
2,542
|
2,542
|
2,542
|
2,542
|
2,547
|
|
Of which: Interim assistance
|
740
|
740
|
740
|
740
|
745
|
|
Completion point assistance
|
1,802
|
1,802
|
1,802
|
1,802
|
1,802
|
|
Memo item: Beyond-HIPC assistance
|
116
|
116
|
116
|
116
|
116
|
|
|
|
|
|
|
|
|
MDRI (SDR millions)
|
|
|
|
|
|
|
Number of countries
|
30
|
30
|
30
|
30
|
30
|
|
Total Debt Relief (cumulative)
|
3,537
|
3,537
|
3,537
|
3,537
|
3,537
|
|
Financed from: MDRI Trusts
|
2,867
|
2,867
|
2,867
|
2,867
|
2,867
|
|
HIPC Umbrella Account
|
670
|
670
|
670
|
670
|
670
|
|
|
|
|
|
|
|
|
PCDR (SDR millions)
|
|
|
|
|
|
|
Number of countries
|
1
|
1
|
1
|
1
|
1
|
|
Total Debt Relief (cumulative)
|
178.1
|
178.1
|
178.1
|
178.1
|
178.1
|
2
|
|
|
|
|
|
|
|
Available Resources
|
|
|
|
|
|
|
GRA
|
|
|
|
|
|
|
Usable resources
|
304.8
|
309.4
|
415.6
|
403.2
|
402.9
|
|
Of which: available Fund borrowings
|
158.9
|
159.6
|
264.3
|
256.5
|
256.4
|
3
|
Uncommitted usable resources
|
201.0
|
192.0
|
281.6
|
278.8
|
280.5
|
|
Repurchases one-year forward
|
2.0
|
3.3
|
5.1
|
7.5
|
10.1
|
|
Repayments of borrowing one-year forward
|
--
|
--
|
--
|
--
|
0.2
|
|
Prudential balance
|
70.8
|
74.9
|
40.1
|
39.6
|
39.6
|
4
|
Forward commitment capacity (FCC)
|
132.1
|
120.4
|
246.7
|
246.7
|
250.7
|
5
|
|
|
|
|
|
|
|
PRG Trust
|
|
|
|
|
|
|
Total loan resources
|
23.5
|
24.0
|
25.8
|
25.8
|
25.8
|
|
Cumulative commitments, net
|
17.4
|
17.7
|
17.6
|
17.7
|
18.4
|
|
Of which: Cumulative disbursements
|
15.9
|
16.1
|
16.3
|
16.5
|
16.6
|
|
Uncommitted loan resources
|
6.2
|
6.4
|
8.2
|
8.1
|
7.5
|
|
|
|
|
|
|
|
|
Arrears
|
|
|
|
|
|
|
GRA
|
1.1
|
1.1
|
1.1
|
1.1
|
1.1
|
|
PRG Trust
|
0.1
|
0.1
|
0.1
|
0.1
|
0.1
|
|
Trust Fund and other
|
0.1
|
0.1
|
0.1
|
0.1
|
0.1
|
|
|
|
|
|
|
|
|
Rates
|
|
|
|
|
|
|
US$ per SDR
|
1.54003
|
1.58550
|
1.60045
|
1.56162
|
1.53669
|
6
|
SDR interest rate (percent)
|
0.32
|
0.47
|
0.55
|
0.27
|
0.14
|
|
Rate of charge, adjusted (percent)
|
1.33
|
1.47
|
1.55
|
1.27
|
1.14
|
|
Rate of remuneration, adjusted (percent)
|
0.31
|
0.47
|
0.55
|
0.27
|
0.14
|
|
|
|
|
|
|
|
|
|
1 -- indicates zero value, zero indicates amounts less than SDR 0.05 billion. Totals may not add due to rounding.
|
|
|
|
2 Includes Post-Catastrophe Debt Relief provided to Haiti on July 22, 2010.
|
|
|
|
|
|
3 As of April 1, 2011, includes (1) activated amount of the NAB; (2) amounts available under Fund bilateral borrowing and note purchase agreements of NAB participants needed to cover financing of undrawn balances under pre-NAB approved Fund arrangements based on the current 1:1 bilateral borrowed to quota resources financing ratio; and (3) undrawn balances under bilateral agreements of non-NAB participants fully available to finance both pre- and post-NAB commitments.
|
|
4 Prudential Balance reflects inclusion of Fund bilateral borrowings, except as noted (in attached definition) following activation of the NAB on April 1, 2011.
|
|
|
5 As of April 1, 2011, reflects activation of the expanded NAB for the first activation period through end-September 2011, and as of October 1st, 2011, for the second activation period through end-March 2012.
|
|
6 As of the date of this report.
|
|
|
Key IMF Financial Statistics
|
|
Term
|
Definition |
|
|
|
Financial Assistance
|
|
GRA
|
The General Resources Account (GRA) contains IMF’s holdings of members’ currencies, SDRs, gold, and other assets. These holdings are principally derived from quota subscription payments plus any activated borrowings.
|
Purchases
|
GRA resources disbursed to members during the period (outflows).
|
Repurchases
|
GRA resources repaid by members during the period (inflows).
|
Credit outstanding
|
Total GRA resources disbursed less repayments.
|
PRG Trust
|
The PRG Trust (PRGT) provides financial support to low-income member countries via concessional loan facilities.
|
Disbursements
|
PRG Trust resources disbursed to members during the period.
|
Repayments
|
PRG Trust resources (including outstanding Trust Fund and Structural Adjustment Facility (SAF) loans) repaid by members during the period.
|
Credit outstanding
|
Total PRG Trust resources disbursed less repayments (including outstanding Trust Fund and Structural Adjustment Facility (SAF) loans).
|
HIPC
|
Assistance provided to eligible countries under the Heavily Indebted Poor Countries (HIPC) Initiative.
|
Number of countries
|
Number of countries for which HIPC assistance has been committed.
|
Commitments
|
Cumulative commitments made to HIPC-eligible members that have reached the decision point under the HIPC Initiative; includes amounts that the IMF has indicated will be committed subject to satisfactory assurances regarding exceptional assistance to be provided by other creditors under the HIPC Initiative.
|
Disbursements
|
Cumulative grants to members eligible for financial assistance under the HIPC Initiative to be used to help meet debt service payments to the IMF.
|
Of which:
|
|
Interim assistance
|
Cumulative grants to members between their decision and completion points.
|
Completion point assistance
|
Final grants to members at their completion points.
|
MDRI
|
The Multilateral Debt Relief Initiative (MDRI) provides 100% debt relief to eligible member countries that are qualified for the assistance. The debt relief covers the full stock of debt owed to the Fund as of end-2004, and still outstanding at the time the country qualifies for such debt relief.
|
Number of countries
|
Number of countries which have received MDRI debt relief.
|
Total Debt Relief
|
|
Financed from
|
|
MDRI Trusts
|
MDRI resources (excluding HIPC debt relief) disbursed to members during the period.
|
HIPC Umbrella Account
|
HIPC resources used as debt relief under the MDRI during the period.
|
|
|
PCDR
|
The Post-Catastrophe Debt Relief (PCDR) Trust provides 100% debt relief to eligible member countries that are qualified for the assistance.
|
Number of countries
|
Number of countries which have received Post-Catastrophe Debt Relief.
|
Total Debt Relief
|
|
Financed from the
|
|
PCDR Trust
|
PCDR resources (excluding HIPC debt relief) disbursed to members during the period.
|
|
|
Available Resources
|
|
GRA
|
|
Usable resources
|
Usable resources consist of: (i) the IMF’s holdings of the currencies of members considered by the Executive Board to have a sufficiently strong balance of payments and reserve position for their currencies to be used in the financing of IMF transactions (see Financial Transactions: http://www.imf.org/cgi-shl/create_x.pl?ftp), (ii) holdings of SDRs, and (iii) unused amounts, if any, under credit lines already activated, such as under the General Arrangements to Borrow and New Arrangements to Borrow (GAB/NAB) and resources available under other Fund borrowing agreements and notes purchase agreements. Subsequent to the activation of the NAB on April 1, 2011, amounts available under Fund bilateral borrowing and note purchase agreements of NAB participants include only those needed to cover financing of commitments under arrangements approved by the Fund prior to April 1, 2011 based on the current 1:1 bilateral borrowed to quota resources financing ratio for such commitments; undrawn balances under bilateral agreements of other creditors not included in the NAB (Czech National Bank, Central Bank of Malta, Slovak Republic, and Bank of Slovenia) are available to finance all (both pre- and post-NAB) commitments.
|
Uncommitted usable
resources
|
Usable resources less the full amount of undrawn balances under existing Fund arrangements.
|
Repurchases one-year forward
|
Repayments by member countries during the coming one-year period. These repurchases add to the supply of the IMF’s usable resources. It is assumed that repurchases would be made on an expectations basis for the SRF, and on an obligations basis under all other facilities (see Terms of IMF Lending: http://www.imf.org/external/np/exr/facts/howlend.htm)
|
Repayments of borrowings one-year forward
|
Repayment obligations on Fund borrowing and note placements in the coming one-year period, including drawings and notes reaching final maturity in the next 12 months plus any encashment requests for early repayment to be met over that same period.
|
Prudential balance
|
Amount set aside to safeguard the liquidity of members’ claims and take account of the potential erosion of the IMF’s resource base. The prudential balance is set at 20 percent of the quotas of members participating in the financing of IMF transactions (Financial Transactions Plan) and any amounts made available under active bilateral borrowing and notes purchase agreements. The prudential balance currently does not cover the encashment needs of NAB participants’ outstanding claims under bilateral borrowing agreements that are to be folded into the NAB. Nor does it extend to the claims of participants in the expanded NAB, as such resources are to be provided by setting aside a portion of the total credit arrangements under the NAB. The prudential ratio of 20 percent as decided by the IMF’s Executive Board reflects historical experience and judgments on the indicative level of uncommitted usable resources that the IMF would normally not use to make financial commitments. The prudential balance does not represent a rigid minimum and IMF resources could, on a strictly temporary basis, fall below this level.
|
Forward commitment capacity
|
A measure of the resources available for new financial commitments, equal to uncommitted usable resources plus repurchases one-year forward less repayments of borrowing due one-year forward and less the prudential balance. As of April 1, 2011, reflects activation of the expanded NAB for the first activation period through end-September 2011, and as of October 1st, 2011, for the second activation period through end-March 2012.
|
|
|
PRG Trust
|
Trust administered by the IMF to conduct concessional lending operations through the Loan, Reserve and Subsidy Accounts.
|
Available loan resources
|
Loan Account resources committed by lenders to the PRG Trust.
|
Cumulative commitments, net
|
Cumulative commitments to borrowers, net of unused amounts under arrangements which have expired or have been canceled.
|
Of which: Cumulative disbursements
|
Disbursements to borrowers under PRGT arrangements.
|
Uncommitted loan resources
|
Available PRGT loan resources less commitments made to eligible member countries.
|
Arrears Outstanding
|
|
GRA
|
Total overdue GRA financial obligations.
|
PRG
|
Total overdue PRGT financial obligations.
|
Trust Fund and other
|
Total overdue financial obligations to the Trust Fund and Structural Adjustment Facility (SAF). Although the Trust Fund and SAF are no longer operational, arrears to the Trust Fund and SAF consist of overdue repayments, interest, or charges on loans provided under these facilities.
|
Rates
|
|
US$ per SDR
|
Exchange rate for the SDR in terms of U.S. dollars. The method for valuing the SDR was revised effective January 1, 2011.
|
|
(See: http://www.imf.org/external/np/tre/sdr/basket.htm)
|
SDR interest rate
|
Interest rate calculated as a weighted average of three month market interest rates on U.S. dollar, euro, Japanese yen and pound sterling assets. The method for valuing the SDR interest rate was revised effective January 7, 2011.
|
|
(See: http://www.imf.org/external/np/tre/tad/sdr_ir.cfm)
|
Rate of Charge, adjusted
|
The basic rate of charge on GRA loans is equal to the SDR interest rate plus 100 basis points to cover the IMF's cost of financing, additions to reserves, and administrative expenses; and further adjusted by a small margin to compensate for income forgone because of charges in arrears.
|
Rate of remuneration, adjusted
|
Interest rate paid to members that provide resources to the IMF. Adjusted by a small margin to allow for special additions to reserves and to compensate for income forgone because of charges in arrears.
|
Investments
|
|
Amount
|
PRG, PRG-HIPC and MDRI Trust resources invested in short-term deposits and medium-term instruments with the Bank for International Settlements (BIS) and bond portfolios managed by the World Bank and private investment managers. Data from the first quarter of 2000 onward also include sight deposits. The SDA contains the profits (sales proceeds minus the value of the gold at the acquisition cost) from sales of the IMF's gold holdings.
|
Average yield (percent)
|
Weighted average yield on time deposits, two days' notice accounts, demand deposit accounts, and fixed income securities.
|
Average maturity (months)
|
Weighted average of remaining maturity of resources placed in time deposits and the modified duration of fixed income securities.
|
Table 2a. Current Financial Arrangements (GRA)
|
as of December 15, 2011
|
(In millions of SDRs, unless indicated otherwise)1
|
(For definitions, see below)
|
|
Member
|
Effective
|
Expiration
|
Amount
|
Undrawn
|
GRA Credit
|
Date2
|
Date
|
Agreed
|
Balance
|
Outstanding3
|
As percent of Quota
|
|
|
|
|
|
|
|
Stand-by Arrangements
|
|
|
|
|
|
|
|
|
Angola
|
11/23/09
|
2/22/12
|
859
|
86
|
773
|
270
|
|
|
Antigua and Barbuda
|
6/7/10
|
6/6/13
|
81
|
54
|
27
|
200
|
|
|
Bosnia
|
7/8/09
|
6/30/12
|
1,015
|
676
|
338
|
200
|
|
|
Dominican Republic
|
11/9/09
|
3/8/12
|
1,095
|
328
|
848
|
387
|
|
|
El Salvador6
|
3/17/10
|
3/16/13
|
514
|
514
|
--
|
--
|
|
|
Greece
|
5/9/10
|
5/8/13
|
26,433
|
8,891
|
17,542
|
1,592
|
|
|
Honduras6
|
10/1/10
|
3/31/12
|
65
|
65
|
--
|
--
|
|
|
Iraq
|
2/24/10
|
7/23/12
|
2,377
|
1,307
|
1,070
|
90
|
|
|
Jamaica
|
2/4/10
|
5/3/12
|
821
|
279
|
542
|
198
|
|
|
Kosovo
|
7/21/10
|
1/20/12
|
93
|
74
|
19
|
32
|
|
|
Latvia
|
12/23/08
|
12/22/11
|
1,522
|
539
|
982
|
691
|
|
|
Maldives
|
12/4/09
|
12/3/12
|
49
|
41
|
8
|
82
|
|
|
Romania6
|
3/31/11
|
3/30/13
|
3,091
|
3,091
|
10,569
|
1,026
|
|
|
Serbia, Republic of
|
9/29/11
|
3/28/13
|
935
|
935
|
1,368
|
292
|
|
|
Sri Lanka
|
7/24/09
|
5/23/12
|
1,654
|
551
|
1,108
|
268
|
|
|
St. Kitts and Nevis
|
7/27/11
|
7/26/14
|
53
|
30
|
24
|
274
|
|
|
Ukraine
|
7/28/10
|
12/27/12
|
10,000
|
7,750
|
9,250
|
674
|
|
|
|
|
|
|
|
|
|
17 Arrangements
|
|
|
50,653
|
25,212
|
44,467
|
|
|
|
|
|
|
|
|
Extended Arrangements
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Armenia
|
6/28/10
|
6/27/13
|
133
|
63
|
420
|
457
|
|
|
Ireland
|
12/16/10
|
12/15/13
|
19,466
|
11,724
|
7,741
|
616
|
|
|
Moldova
|
1/29/10
|
1/28/13
|
185
|
105
|
80
|
65
|
|
|
Portugal
|
5/20/11
|
5/19/14
|
23,742
|
14,664
|
9,078
|
882
|
|
|
Seychelles
|
12/23/09
|
12/22/12
|
20
|
7
|
24
|
218
|
|
|
|
|
|
|
|
|
|
5 Arrangements
|
|
|
43,546
|
26,564
|
17,344
|
|
|
|
|
|
|
|
|
Flexible Credit Line
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Colombia6
|
5/6/11
|
5/5/13
|
3,870
|
3,870
|
--
|
--
|
|
|
Mexico6
|
1/10/11
|
1/9/13
|
47,292
|
47,292
|
--
|
--
|
|
|
Poland6
|
1/21/11
|
1/20/13
|
19,166
|
19,166
|
--
|
--
|
|
|
|
|
|
|
|
|
|
|
3 Arrangements
|
|
|
70,328
|
70,328
|
--
|
|
|
|
|
|
|
|
|
Precautionary and Liquidity Line
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Macedonia6
|
1/19/11
|
1/18/13
|
413
|
216
|
197
|
286
|
|
|
|
|
|
|
|
|
|
1 Arrangement
|
|
|
413
|
216
|
197
|
|
|
|
|
|
|
|
|
Total 26 SBA, EFF, FCL, and PCL
|
|
|
164,941
|
122,320
|
62,008
|
|
Of which post-NAB commitments
|
|
|
28,600
|
19,500
|
|
|
|
|
|
|
|
|
|
|
1 -- indicates zero value. Totals may not add due to rounding.
|
|
|
|
|
2 Dates in bold indicate arrangements approved during a NAB activation period.
|
|
|
|
3 Includes credit outstanding under the member's expired arrangements.
|
|
|
|
4 Treated as precautionary by the authorities.
|
|
|
|
|
|
5 Indicates undrawn and scheduled purchases in accordance with latest Board approved phasing under the arrangement.
|
|
6 Treated as precautionary by the authorities.
|
|
|
|
|
|
Table 2b. Current Financial Arrangements (PRGT)
|
as of December 15, 2011
|
(In millions of SDRs, unless indicated otherwise)1
|
(For definitions, see below)
|
|
|
|
|
|
|
|
Member
|
Effective
|
Expiration
|
Amount
|
Undrawn
|
PRGT Loans
|
Date
|
Date
|
Agreed
|
Balance
|
Outstanding 2
|
As percent of Quota
|
|
|
|
|
|
|
|
Extended Credit Facility
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Afghanistan
|
11/14/11
|
11/13/14
|
85
|
73
|
87
|
54
|
Armenia
|
6/28/10
|
6/27/13
|
133
|
77
|
100
|
109
|
Benin
|
6/14/10
|
9/13/13
|
74
|
42
|
56
|
91
|
Burkina Faso
|
6/14/10
|
6/13/13
|
46
|
26
|
88
|
146
|
Burundi
|
7/7/08
|
1/31/12
|
51
|
5
|
83
|
108
|
Comoros
|
9/21/09
|
9/20/12
|
14
|
6
|
10
|
108
|
Congo, Dem.Rep.of
|
12/11/09
|
12/10/12
|
346
|
148
|
309
|
58
|
Cote d'Ivoire
|
11/4/11
|
11/3/14
|
390
|
309
|
399
|
123
|
Djibouti
|
9/17/08
|
6/16/12
|
13
|
3
|
11
|
70
|
Ghana
|
7/15/09
|
7/14/12
|
387
|
179
|
309
|
84
|
Grenada
|
4/18/10
|
4/17/13
|
9
|
6
|
19
|
160
|
Guinea-Bissau
|
5/7/10
|
5/6/13
|
22
|
7
|
7
|
51
|
Haiti
|
7/21/10
|
7/20/13
|
41
|
25
|
16
|
20
|
Kenya
|
1/31/11
|
1/30/14
|
489
|
380
|
364
|
134
|
Kyrgyz Republic
|
6/20/11
|
6/19/14
|
67
|
57
|
110
|
124
|
Lesotho
|
6/2/10
|
6/1/13
|
42
|
28
|
20
|
57
|
Liberia
|
3/14/08
|
3/31/12
|
248
|
4
|
38
|
29
|
Malawi
|
2/19/10
|
2/18/13
|
52
|
38
|
94
|
136
|
Mali
|
5/28/08
|
12/31/11
|
53
|
6
|
54
|
58
|
Mauritania
|
3/15/10
|
3/14/13
|
77
|
44
|
43
|
67
|
Moldova
|
1/29/10
|
1/28/13
|
185
|
45
|
229
|
186
|
Sao Tome
|
3/2/09
|
3/1/12
|
3
|
2
|
3
|
43
|
Sierra Leone
|
7/1/10
|
6/30/13
|
31
|
22
|
71
|
69
|
Tajikistan
|
4/21/09
|
4/20/12
|
104
|
26
|
78
|
90
|
Yemen, Republic of
|
7/30/10
|
7/29/13
|
244
|
209
|
35
|
14
|
|
|
|
|
|
|
|
25 Arrangements
|
|
|
3,206
|
1,769
|
2,635
|
|
|
|
|
|
|
|
|
Exogenous Shocks Facility
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0 Arrangement
|
|
|
--
|
--
|
--
|
|
|
|
|
|
|
|
|
Standby Credit Facility
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Honduras5
|
10/1/10
|
3/31/12
|
65
|
65
|
16
|
13
|
Solomon Islands5
|
12/6/11
|
12/5/12
|
5
|
5
|
12
|
120
|
|
|
|
|
|
|
|
2 Arrangements
|
|
|
70
|
70
|
29
|
|
|
|
|
|
|
|
|
Total 27 ECF, ESF, and SCF
|
|
|
3,276
|
1,839
|
2,664
|
|
|
|
|
|
|
|
|
|
1 -- indicates zero value. Totals may not add due to rounding.
|
|
|
|
|
2 Includes credit outstanding under the member's expired arrangements.
|
|
|
|
3 Treated as precautionary by the authorities.
|
|
|
|
|
|
4 Reflects latest projections of scheduled disbursements under current arrangements, including expected augmentations.
|
|
5 Treated as precautionary by the authorities.
|
|
|
|
|
|
Current Financial Arrangements (GRA, PRG)
|
|
Term
|
Definition |
|
Arrangements
|
IMF credit is made available under a variety of borrowing arrangements with different disbursement schedules and maturities depending on the balance of payment needs of the member.
|
GRA
|
|
Stand-By Arrangements
|
The most common type of credit arrangement designed to provide short-term financial assistance. Purchases under Stand-By Arrangements are repayable in 8 quarterly installments 3¼ - 5 years after disbursement.
|
Extended Arrangements
|
Extended Arrangements provide credit for a longer period since these arrangements usually require fundamental reforms which may need more time to put in place and take effect. Drawings under extended arrangements are repayable in 12 semiannual installments 4½ - 10 years after disbursement.
|
Flexible Credit Line
|
The Flexible Credit Line (FCL) has been established to allow members with very strong track records to access IMF resources based on pre-set qualification criteria to deal with all types of balance of payments problems. The FCL could be used both on a precautionary (crisis prevention) and nonprecautionary (crisis resolution) basis. Members may request either a one-year arrangement with no interim reviews, or a two-year arrangement with an interim review of qualification required after twelve months. Upon expiration, the Fund may approve additional FCL arrangements for the member. Access is determined based on individual country financing needs and is not subject to a pre-set cap. Purchases under FCL arrangements are repayable in 8 quarterly installments 3¼ - 5 years after disbursement.
|
Precautionary and Liquidity Line
|
The Precautionary and Liquidity Line (PLL), which replaces the Precautionary Credit Line (PCL), has been established to meet actual or potential balance of payments needs of members with sound economic fundamentals and institutional policy frameworks but with some remaining vulnerabilities that preclude them from using the FCL. Access under a PLL arrangement varies depending on the duration of the arrangement and member-specific needs. PLL arrangements can have a duration of either six months or one to two years. Under a six-month arrangement, access would not exceed 250 percent of a member’s quota, which could be augmented to a maximum of 500 percent in exceptional circumstances where the member faces a balance of payments need that is of a short-term nature and results from exogenous shocks, including from heightened regional or global economic stress conditions. For one to two year arrangements, the maximum access upon approval is equal to 500 percent of a member’s quota for the first year and up to 1000 percent of quota for the second year (the latter of which could also be brought forward to the first year where needed, following a Board review). One to two year arrangements are subject to Executive Board reviews every six months.
|
PRG Trust
|
|
ECF Arrangements
|
Concessional arrangements providing credit in support of a three-year macroeconomic and structural adjustment program to eligible low-income members facing protracted balance of payment issues (formerly known as PRGF). The loans are repayable in 10 equal semiannual installments 5½ - 10 years after disbursement.
|
ESF Arrangements
|
Concessional arrangements ranging from one to two years to provide financial assistance to low-income countries that are experiencing exogenous shocks but do not have an ECF arrangement in place. The repayment terms are identical to ECF arrangements.
|
SCF Arrangements
|
Concessional arrangements ranging from one to two years to provide financial assistance to low-income countries that are experiencing short-term but not protracted balance of payments needs. The loans are repayable in 9 equal semiannual installments 4 - 8 years after disbursement.
|
|
Interest on all PRGT loans (including outright drawings under the RCF) has been waived through end-December 2011.
|
Arrangement Details
|
IMF financial arrangements are reviewed regularly to assess progress in policy reforms. The disbursement of funds under an arrangement is linked to the achievement of certain financial targets.
|
Next Scheduled Review
|
Expected date the arrangement will be reviewed by the Executive Board.
|
Date of Approval
|
Date the arrangement was approved by the Executive Board.
|
Date of Expiration
|
Arrangements have a specified duration. Commitments are no longer available after the expiration of the arrangement.
|
Amount Agreed
|
Amount of credit available under an arrangement.
|
Undrawn Balance
|
Amount of credit available under an arrangement but not yet drawn.
|
Total Credit Outstanding
|
Total unpaid and outstanding principal due to the IMF under existing and expired arrangements.
|
Total Credit Outstanding as
|
|
percent of quota
|
Total credit outstanding in terms of member's quota.
|
Drawings available Thru End-2011
|
Credit available to a member under an arrangement (including expected augmentation of PRGT arrangements) through the end of 2011.
|
Scheduled Repayments Thru End-2011
|
The amount of funds scheduled to be repaid by the member through the end of 2011.
|
Table 3. Status of Commitments of IMF HIPC Assistance
|
as of December 15, 2011
|
(In millions of SDRs)1
|
(For definitions, see below)
|
|
|
|
|
|
|
|
Member
|
Decision Point
|
Completion Point
|
Amount Committed
|
Amount Disbursed 2
|
|
|
|
|
|
|
|
Under the Original HIPC Initiative
|
|
|
|
|
|
|
Bolivia
|
Sep. 1997
|
Sep. 1998
|
21.2
|
|
21.2
|
|
Burkina Faso
|
Sep. 1997
|
Jul. 2000
|
16.3
|
|
16.3
|
|
Côte d'Ivoire
|
Mar. 1998
|
--
|
16.7
|
3
|
--
|
|
Guyana
|
Dec. 1997
|
May. 1999
|
25.6
|
|
25.6
|
|
Mali
|
Sep. 1998
|
Sep. 2000
|
10.8
|
|
10.8
|
|
Mozambique
|
Apr. 1998
|
Jun. 1999
|
93.2
|
|
93.2
|
|
Uganda
|
Apr. 1997
|
Apr. 1998
|
51.5
|
|
51.5
|
|
Total Original HIPC
|
|
|
235.3
|
|
218.6
|
|
|
|
|
|
|
|
|
Under the Enhanced HIPC Initiative
|
|
|
|
|
|
|
Afghanistan
|
Jul. 2007
|
Jan. 2010
|
--
|
4
|
--
|
|
Benin
|
Jul. 2000
|
Mar. 2003
|
18.4
|
|
20.1
|
|
Bolivia
|
Feb. 2000
|
Jun. 2001
|
41.1
|
|
44.2
|
|
Burkina Faso
|
Jul. 2000
|
Apr. 2002
|
27.7
|
|
29.7
|
|
Burundi
|
Aug. 2005
|
Jan. 2009
|
19.3
|
|
22.4
|
|
Cameroon
|
Oct. 2000
|
Apr. 2006
|
28.6
|
|
33.7
|
|
Central African Republic
|
Sep. 2007
|
Jun. 2009
|
17.2
|
|
18.1
|
|
Chad
|
May. 2001
|
Floating
|
14.3
|
|
8.6
|
|
Comoros
|
Jul. 2010
|
Floating
|
2.9
|
|
--
|
|
Congo, Dem. Rep. of
|
Jul. 2003
|
Jul. 2010
|
280.3
|
|
330.7
|
|
Congo, Rep. of
|
Mar. 2006
|
Jan. 2010
|
5.4
|
|
6.3
|
|
Côte d'Ivoire
|
Apr. 2009
|
Floating
|
25.2
|
|
15.1
|
|
Ethiopia
|
Nov. 2001
|
Apr. 2004
|
45.1
|
|
46.7
|
|
Gambia, The
|
Dec. 2000
|
Dec. 2007
|
1.8
|
|
2.3
|
|
Ghana
|
Feb. 2002
|
Jul. 2004
|
90.1
|
|
94.3
|
|
Guinea
|
Dec. 2000
|
Floating
|
24.2
|
|
10.0
|
|
Guinea-Bissau
|
Dec. 2000
|
Dec. 2010
|
9.2
|
|
9.4
|
|
Guyana
|
Nov. 2000
|
Dec. 2003
|
31.1
|
|
34.0
|
|
Haiti
|
Nov. 2006
|
Jun. 2009
|
2.1
|
|
2.3
|
|
Honduras
|
Jun. 2000
|
Apr. 2005
|
22.7
|
|
26.4
|
|
Liberia
|
Mar. 2008
|
Jun. 2010
|
440.9
|
|
451.9
|
5
|
Madagascar
|
Dec. 2000
|
Oct. 2004
|
14.7
|
|
16.4
|
|
Malawi
|
Dec. 2000
|
Aug. 2006
|
33.4
|
|
37.2
|
|
Mali
|
Sep. 2000
|
Mar. 2003
|
34.7
|
|
38.5
|
|
Mauritania
|
Feb. 2000
|
Jun. 2002
|
34.8
|
|
38.4
|
|
Mozambique
|
Apr. 2000
|
Sep. 2001
|
13.7
|
|
14.8
|
|
Nicaragua
|
Dec. 2000
|
Jan. 2004
|
63.5
|
|
71.2
|
|
Niger
|
Dec. 2000
|
Apr. 2004
|
31.2
|
|
34.0
|
|
Rwanda
|
Dec. 2000
|
Apr. 2005
|
46.8
|
|
50.6
|
|
São Tomé and Príncipe
|
Dec. 2000
|
Mar. 2007
|
0.8
|
|
0.9
|
|
Senegal
|
Jun. 2000
|
Apr. 2004
|
33.8
|
|
38.4
|
|
Sierra Leone
|
Mar. 2002
|
Dec. 2006
|
100.0
|
|
106.6
|
|
Tanzania
|
Apr. 2000
|
Nov. 2001
|
89.0
|
|
96.4
|
|
Togo
|
Nov. 2008
|
Dec. 2010
|
0.2
|
|
0.2
|
|
Uganda
|
Feb. 2000
|
May. 2000
|
68.1
|
|
70.2
|
|
Zambia
|
Dec. 2000
|
Apr. 2005
|
468.8
|
|
508.3
|
|
Total Enhanced HIPC
|
|
|
2,181.1
|
|
2,328.0
|
|
|
|
|
|
|
|
|
Grand Total
|
|
|
2,416.4
|
|
2,546.6
|
|
|
|
|
|
|
|
|
|
1 -- indicates zero value. Totals may not add due to rounding.
|
|
|
|
|
|
2 Includes interest on amounts committed under the Enhanced HIPC Initiative.
|
|
3 Equivalent to the committed amount of US $22.5 million at decision point exchange rates (3/17/98).
|
|
4 At the time of its decision point, Afghanistan did not have any outstanding eligible debt.
|
|
5 Does not include beyond-HIPC assistance of SDR 116.2 million.
|
|
Status of Commitments of HIPC Assistance
|
|
Term
|
Definition |
|
Decision Point
|
Point at which the IMF decides whether a member qualifies for assistance under the HIPC Initiative (normally at the end of the initial three-year performance period) and decides on the amount of assistance to be committed.
|
Completion Point
|
Point at which the country receives the bulk of its assistance under the HIPC Initiative, without any further policy conditions. Under the enhanced HIPC Initiative, the timing of the completion point is linked to the implementation of pre-agreed key structural reforms (i.e., floating completion point).
|
Amount Committed
|
Amount of HIPC assistance determined, in consultation with the World Bank, at the decision point to be made available by the IMF.
|
Amount Disbursed
|
Resources disbursed to the member to help meet debt service payments to the IMF. Disbursements are normally dependent on receipt of sufficient financing assurances from other creditors.
|
Table 4. Status of Multilateral Debt Relief Initiative Assistance
|
as of December 15, 2011
|
(In millions of SDRs)1
|
(For definitions, see below)
|
|
|
|
|
|
Member
|
Delivery
|
Eligible Debt
|
Date
|
GRA 2
|
PRGT
|
Total |
|
|
|
|
|
|
Benin
|
01/06/06
|
--
|
36.1
|
36.1
|
Bolivia
|
01/06/06
|
89.8
|
71.2
|
160.9
|
Burkina Faso
|
01/06/06
|
--
|
62.1
|
62.1
|
Burundi
|
02/02/09
|
|
26.4
|
26.4
|
Cambodia
|
01/06/06
|
--
|
56.8
|
56.8
|
Cameroon
|
04/28/06
|
--
|
173.3
|
173.3
|
Central African Republic
|
07/02/09
|
--
|
4.0
|
4.0
|
Congo, Dem. Rep. of
|
07/06/10
|
--
|
248.1
|
248.1
|
Congo, Rep. of
|
01/28/10
|
--
|
7.9
|
7.9
|
Ethiopia
|
01/06/06
|
--
|
112.1
|
112.1
|
Gambia, The
|
12/20/07
|
--
|
9.4
|
9.4
|
Ghana
|
01/06/06
|
--
|
265.4
|
265.4
|
Guinea-Bissau
|
12/17/10
|
--
|
0.5
|
0.5
|
Guyana
|
01/06/06
|
--
|
45.1
|
45.1
|
Honduras
|
01/06/06
|
--
|
107.5
|
107.5
|
Madagascar
|
01/06/06
|
--
|
137.3
|
137.3
|
Malawi
|
09/01/06 - 12/19/06 3
|
10.8
|
27.0
|
37.9
|
Mali
|
01/06/06
|
--
|
75.1
|
75.1
|
Mauritania
|
06/22/06
|
--
|
32.9
|
32.9
|
Mozambique
|
01/06/06
|
--
|
106.6
|
106.6
|
Nicaragua
|
01/06/06
|
--
|
140.5
|
140.5
|
Niger
|
01/06/06
|
--
|
77.6
|
77.6
|
Rwanda
|
01/06/06
|
--
|
52.7
|
52.7
|
São Tomé and Príncipe
|
03/19/07 - 12/28/07 4
|
--
|
1.4
|
1.4
|
Senegal
|
01/06/06
|
--
|
100.3
|
100.3
|
Sierra Leone
|
12/18/06
|
--
|
117.3
|
117.3
|
Tajikistan
|
01/06/06
|
--
|
69.3
|
69.3
|
Tanzania
|
01/06/06
|
--
|
234.0
|
234.0
|
Uganda
|
01/06/06
|
--
|
87.7
|
87.7
|
Zambia
|
01/06/06
|
--
|
402.6
|
402.6
|
|
|
|
|
|
Total
|
|
100.6
|
2,888.1
|
2,988.7
|
|
1 Excluding HIPC and Beyond-HIPC assistance of SDR 548.5 million provided to Liberia in June 2010.
|
|
2 -- indicates zero value. Totals may not add due to rounding.
|
|
|
|
3 MDRI assistance to Malawi was delivered in September 2006. Following the receipt of satisfactory financing assurances from other creditors, Malawi received additional MDRI assistance financed from HIPC topping-up assistance in December 2006.
|
4 MDRI assistance to São Tomé and Príncipe was delivered in March 2007. Following the receipt of satisfactory financing assurances from other creditors, São Tomé and Príncipe received additional MDRI assistance financed from HIPC topping-up assistance in December 2007.
|
Status of Multilateral Debt Relief Initiative Assistance
|
|
|
Term
|
Definition |
|
Debt Relief Delivery Date
|
The effective date of delivery of MDRI assistance to qualified members.
|
Eligible Debt
|
|
GRA
|
Assistance that covers credit outstanding under the GRA
|
PRG
|
Assistance that covers credit outstanding under the PRG Trust
|
|